Tank Repair Kits

"Mr Crystal"
Directions and Information

Description:
A cement based waterproofing compound that chemically reacts with moist cement based substrates forming insoluble crystals in the capillary tracts of the substrate permanently waterproofing the surface yet still allowing the surface to breathe.

Coverage:
0.8 - 1.1 kg per m2/coat.

Surface Preparation:
Apply to cement based surfaces that are free from dirt, dust, grease, oil, efflorescence and other contaminants. Structure to be repaired must have basic structural integrity. Clean out and patch cracks larger than 0.25 mm thick. Acid etch smooth surfaces and efflorescence contaminated surfaces with a 15% solution of muriatic acid. Scrub well into the surface, leave for 10 - 15 minutes and rinse down thoroughly. Use caustic soda solution to clean oil contaminated surfaces then thoroughly hose down to completely remove contamination. Badly contaminated areas may require sand blasting to provide a positive key. Hose down thoroughly the surface to be coated.

Mixing:
Mix only the amount that can be used in 10 - 15 minutes. Mix 1 kg with a cup of water and mix to a thick paste. Mix thoroughly and add water to bring the mixture to the desired consistency. The
final ratio should be about 4 kg powder to 1.5 litres water.

Application:
Crystal Sealer can only be applied to green or wet cement based substrates. Apply with enclosed brush working the mixture well into voids. To prevent segregation and a uniform mixture stir the mixture frequently during the application and dip brush deep into the mixture so that a thick coat can be applied.
Apply a second coat while the first coat is still green or tacky to a total of 6mm thick and approx 30mm each side of crack.

Aeration can be achieved by pumping the water via a garden sprinkler back into the tank. It is important that the water be allowed to freefall, as this is the point where it absorbs fresh oxygen.

A number of chemical problems can also occur:
- Deterioration of roof, gutters or storage tanks, if they are constructed of galvanised iron, may give rise to rusty water, excessive zinc contamination's and a metallic taste.
-New roofs or those that have been freshly painted should be allowed to weather for some months to wash off surfactants and other residues before collecting the water.
-Contamination of water from creosote build-up (usually from wood heaters), industrial pollution and motor vehicle emissions.
-pH Levels should be checked regularly and maintained between 6.5 and 8.5. Test kits can be obtained from swimming pool or hardware stores.

This guide has been compiled from the State Water Laboratory of Victoria's report on Management of Water Quality of Private Drinking Water Systems". For enquiries contact either:

Microbiology Staff 03 9508 2670
Chemistry Staff 03 9508 2656

TIP
If you are running an underground pipe to your tank (siphon system) make sure you have a flushing opening available at the lowest point. After a long dry spell flush the pipe to avoid pushing stale water that is soaked in organic matter (leaves, dirt) into your precious water reserve. It is such organic material that blooms into oxygen depleting growths leading to stagnation